• OPR & Design review
• Cx plan and functional testing
• Issue log and closure
• Systems manual and training
• Design and submittal review
• Systems manual
• Operator training
• Post-occupancy review
• Facade, roof and glazing checks
• Mock-up testing
• Air and water tightness tests
• Thermography